{"id":831,"date":"2025-12-01T11:23:13","date_gmt":"2025-12-01T11:23:13","guid":{"rendered":"https:\/\/alacpakistan.com\/Letters\/?page_id=831"},"modified":"2025-12-01T11:24:41","modified_gmt":"2025-12-01T11:24:41","slug":"ntdc","status":"publish","type":"page","link":"https:\/\/alacpakistan.com\/Letters\/ntdc\/","title":{"rendered":"NTDC"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"831\" class=\"elementor elementor-831\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a093894 e-flex e-con-boxed e-con e-parent\" data-id=\"a093894\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5066151 elementor-widget elementor-widget-heading\" data-id=\"5066151\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">NTDC\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3e4030b e-flex e-con-boxed e-con e-parent\" data-id=\"3e4030b\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c1846b6 color-scheme-inherit text-left elementor-widget elementor-widget-text-editor\" data-id=\"c1846b6\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Managing Director National Transmission &amp; Despatch Co. Ltd Lahore, 15Tth May 2024, Subject: Fake and Bogus complaint attributed to Transparency International Pakistan and received by NTDC regarding \u201cUndue Favor to Contractor by NTDC TL Design departing by accepting under-designed reels against\u00a0<a href=\"https:\/\/transparency.org.pk\/\/Letters_2022_Government_of_Pakistan\/NTDC\/ManagingDirector(NTDCL).pdf\" target=\"_blank\" rel=\"noopener\"><strong>(Download here)<\/strong><\/a>\u00a0<\/p><p>NATIONAL TRANSMISSION &amp; DESPATCH COMPANY Office of General Manager ,Dated 3 \/ Dec \/ 2021 , Subject: INQUIRY COMMITTEE CONSTITUTED TO PROBE INTO COMPLAINT LODGED BY MR. SOHAIL MUZAFFAR, CHAIRMAN TRANSPARENCY INTERNATIONAL, PAKISTAN RECEIVED FROM MINISTRY OF ENERGY (POWER DIVISION) AGAINST FRAUDULENT &amp; COLLUSIVE PRACTICES IN NTDC TENDER NO. ADB-401A\u00a0<a href=\"https:\/\/transparency.org.pk\/Letters_2022_Government_of_Pakistan\/NTDC\/NTDC_Letter_23_Dec_2021.pdf\" target=\"_blank\" rel=\"noopener\"><strong>(Download here)<\/strong><\/a><\/p><p>Engineer Muhammad Arshad Chaudhry, Managing Director, National Transmission &amp; Despatch Company (NTDC) Limited, WAPDA House, Lahore. , 11th March, 2015 , Sub: Violation of PPRA Rules 32 by NTDC Introducing Discriminatory Clauses in Tender No, ADB-77-2014 to be Opened 30.03.2015.\u00a0\u00a0<a href=\"https:\/\/transparency.org.pk\/Letters_2022_Government_of_Pakistan\/NTDC\/11th-March-2015-NTDCL-Govt-of-Pakistan.pdf\" target=\"_blank\" rel=\"noopener\"><strong>(Download here)<\/strong><\/a><\/p><p>Managing Director, National Transmission &amp; Despatch Company (NTDC) Ltd, WAPDA House, Lahore. , 16th September, 2015\u00a0 , Sub: Corruption in the Evaluation of Design, Manufacture. Supply, Installation, Testing and Commissioning of (Lot-1) 500 KV Double Circuit Quad Bundle Thar-MatiariTransmission Line starting from Thar on Especially Designed Towers Zone A (Appox. 110 KM).\u00a0\u00a0<a href=\"https:\/\/transparency.org.pk\/Letters_2022_Government_of_Pakistan\/NTDC\/16th-Sep-2015-NTDCL.pdf\" target=\"_blank\" rel=\"noopener\"><strong>(Download here)<\/strong><\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>NTDC Managing Director National Transmission &amp; Despatch Co. Ltd Lahore, 15Tth May 2024, Subject: Fake and Bogus complaint attributed to<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-831","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/pages\/831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/comments?post=831"}],"version-history":[{"count":4,"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/pages\/831\/revisions"}],"predecessor-version":[{"id":836,"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/pages\/831\/revisions\/836"}],"wp:attachment":[{"href":"https:\/\/alacpakistan.com\/Letters\/wp-json\/wp\/v2\/media?parent=831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}